The role of risk management in time constrained projects - a case study of the Robert Bosch Ltd. Cabin Sensing Radar development project

Elmentve itt :
Bibliográfiai részletek
Szerző: Kőrösi Anna
További közreműködők: Balázs Odett
Szemere Dr. Tibor Pál
Dokumentumtípus: Diplomadolgozat
Kulcsszavak:automotive industry
product development
project management
risk management
time-constraints
Online Access:http://dolgozattar.uni-bge.hu/59078

MARC

LEADER 00000nta a2200000 i 4500
001 dolg59078
005 20251027142924.0
008 251027suuuu hu om 000 eng d
040 |a BGE Dolgozattár Repozitórium  |b hun 
041 |a en 
100 1 |a Kőrösi Anna 
245 1 4 |a The role of risk management in time constrained projects - a case study of the Robert Bosch Ltd. Cabin Sensing Radar development project  |c Kőrösi Anna  |h [elektronikus dokumentum] 
520 3 |a This thesis explores the role of risk management in engineering projects operating under strict time constraints, using Bosch’s Cabin Sensing Radar (CSR) development as a case study. The urgency of complying with evolving U.S. vehicle safety regulations has significantly impacted the project’s timeline, introducing a high degree of complexity and uncertainty. To examine these challenges, a mixed-method approach was applied, combining literature review, internal documentation analysis, and semi-structured interviews with Bosch project managers. The study first provides a general overview of risk management theory and tools, followed by an in-depth look at how Bosch implements these practices in real-world projects. The MMC 5k45 CSR project serves as the primary focus for analyzing risk identification, assessment, and mitigation. Based on the findings, the thesis offers targeted recommendations, such as improving engineer training, streamlining internal processes, and integrating cross-functional collaboration. The study confirms that effective and proactive risk management is essential for the success of fast-paced development projects. Without it, delays, inefficiencies, and missed business opportunities can seriously threaten project outcomes. The insights gained contribute to broader project management practices and may serve as valuable guidance for similar projects across the industry. 
695 |a automotive industry 
695 |a product development 
695 |a project management 
695 |a risk management 
695 |a time-constraints 
700 1 |a Balázs Odett  |e ths 
700 1 |a Szemere Dr. Tibor Pál  |e ths 
856 4 0 |u http://dolgozattar.uni-bge.hu/59078/1/The%20role%20of%20risk%20management%20in%20time%20constrained%20projects%20-%20a%20case%20study%20of%20the%20Robert%20Bosch%20Ltd.%20Cabin%20Sensing%20Radar%20development%20project%20.pdf  |z Dokumentum-elérés 
856 4 0 |u http://dolgozattar.uni-bge.hu/59078/2/Declaration%20of%20the%20work%20uploaded.pdf  |z Dokumentum-elérés 
856 4 0 |u http://dolgozattar.uni-bge.hu/59078/3/SZAKDOLGOZAT%20ELBI%CC%81RA%CC%81LA%CC%81SA.pdf  |z Dokumentum-elérés 
856 4 0 |u http://dolgozattar.uni-bge.hu/59078/4/K%C5%91r%C3%B6si%20Anna-belso-biralo-alapkepzes.pdf  |z Dokumentum-elérés